When your cargo is oversized, overweight, or simply too critical to fail, Map Supply Chain Solutions delivers engineered project logistics end to end. We plan and execute OOG/break‑bulk moves with route surveys, transport drawings, permits and escorts, crane and rigging, and on‑site installation—underpinned by HSE‑compliant method statements and specialist supervision. From factory to foundation, we coordinate heavy haulage, port and marine operations, chartering, and customs, while keeping you informed with proactive updates and live ETAs via a single point of contact 24/7. Whether it’s a one‑off heavy lift or a multi‑shipment project, we balance safety, schedule, and cost—without compromise.

 

What’s included

OOG/break‑bulk transport: flats/OTs, mafi/Ro‑Ro, break‑bulk vessels, barge/coaster options
Route survey & engineering: sweep‑path analysis, bridge/overhead clearance, ground‑bearing checks
Permits & escorts: oversize/overweight permits, police/private escorts, convoy planning, night windows
Crane & rigging: lift plans, rigging studies, certified gear, lift supervision (AP/LMI/RTO)
(RCS/DEP/ARR/NFD), live ETAs, proactive alerts
Heavy haulage: hydraulic modular/multi‑axle, low‑beds/extendables, SPMT coordination where required
Site services: jacking/skidding, gantries/strand jacks, placement on foundations/anchor bolts
Port & marine: berth/gear planning, port captaincy, lashing/securing to CTU/CSS codes, tally/surveys
Chartering: full/part charters, break‑bulk/heavy‑lift carriers, barge towage, berth windows
Documentation & customs: project HS mapping, temporary imports, exemptions, bonds, TIR/transit
HSE & quality: method statements, risk assessments, toolbox talks, QA/QC and photo logs
Visibility: milestone plan, live ETAs, exceptions management, daily/weekly progress reports
Insurance & surveys: all‑risk/marine cargo, pre‑shipment/transit/marine warranty surveys (MWS)

Road:

heavy prime movers, hydraulic modular trailers (Goldhofer/Scheuerle type), low‑beds, extendables, girder bridge where available

Lifting

mobile/crawler cranes 50–500t+, gantries, strand jacks, spreader bars, lifting beams, skids, jacks

Marine:

Ro‑Ro ramps, heavy‑lift vessels, barges and tugs, roll‑on/roll‑off or lift‑on/lift‑off (RO/RO & LO/LO)

Charter/Part‑charter

custom cribbing, dunnage, chains, lashings, welding pads to surveyor‑approved plans

How It Works

Feasibility & data collection: dims/weight, COG, lifting points, drawings, route start/end, site constraints.
Engineering & pricing: route survey, transport and lift plans, equipment selection, schedule, all‑in quote.
Permits & prep: oversize/overweight permits, police/private escorts, port bookings, chartering (if needed).
Execution: pickup, heavy haul, port ops, loading/lashing, sailing or border transit, delivery to site.
Lifting & installation: crane/rigging per approved method statement, placement, de‑rig, site handover.
Close‑out: inspections, POD, as‑built drawings/photos, claims support if required.
Coverage & indicative timelines

Coverage & indicative SLAs

Corridors: Pakistan domestic (ports to plant sites nationwide) and Pakistan ↔ GCC via major hubs (Karachi/Port Qasim ↔ Jebel Ali/Dammam/Hamad/Sohar).
Indicative lead times (subject to permits, weather, port/border conditions):
Engineering & permits: 5–20 working days depending on route/jurisdiction

Domestic heavy haul:
2–10 days door‑to‑door after permits
Sea leg (PK ↔ GCC): ~5–14 days port‑to‑port on suitable services
Site installation: per lift plan and crane availability

Documents required

GA drawings with exact dims, weight, COG, lifting points and rigging diagram Packing list, commercial invoice, HS codes, SOW, Incoterms


Special certificates:

MSDS/IMDG (if DG), material certificates if needed

Site info

access roads, ground‑bearing capacity, overhead obstructions, working hours, HSE rules


Method statements, risk assessments (JSA), and toolbox talks for every critical activity
Compliance with local regulations and industry codes (CTU/CSS, IMDG where applicable)
Third‑party surveys: route, pre‑shipment, lashing, and marine warranty (as required)
Contingency planning for weather, congestion, and alternate routes/equipment

Add‑ons

All‑risk insurance with MWS compliance; additional SRCC/War cover where requested
Port captaincy, tally, drone visuals, progress photography, 3D lift/rigging animations
Temporary storage/laydown yards, customs exemptions/bonds, document attestation
KPI dashboards and daily/weekly executive updates; EDI/API feeds for milestones

Share: origin/destination, dims/weight, COG, drawings, photos, pickup/delivery conditions, required delivery date, and any constraints (access width/height, ground bearing, powerline/bridge clearances).
We’ll revert with a feasibility note, options, and timelines—typically within 2–3 business days for engineered moves.